Click Here to return to the Index

 Sailplane Construction Project Session #111

Comet Sailplane Project
 
Sue and I went to early church this morning and then out to breakfast. Then this afternoon we went to a matinee to see Tom Hanks new movie "Angels and Demons" and got back home around 3:30 p.m. Since the left half of the Sailplane wing was almost complete, I spent some time and shaped and sanding the leading edge and putting the proper taper on the trailing edge. Then I put the left half of the wing plan on the work table and pinned the completed center section in place. I applied Elmer's Carpenter aliphatic glue to the ends of the leading and trailing edges of both panels and pinned the left half of the wing panel in place, blocking it up at the polyhedral break with the support jig built and discussed in Report No. 109 as shown below. The glue on the leading and trailing edge joints was allowed to dry for about 4-1/2 hours. Before retiring for bed this evening, aliphatic glue was worked down in between the second spar overlap and clamped to let dry overnight. The dihedral joint will be strong enough to take up in the morning and the other three spars will be glued and clamped.................Tandy
 

Click Here to go to the next page (112)....