Click Here to return to the Index

 J-3 Cub Construction Project Session #22

22 J-3 Cub Stab left Spline
 
After soaking the three 1/24" X 1/8" balsa strips in hot water for about hour, Titebond was put between the three strips and the spline formed around the composite card board form. During the forming process, balsa pieces were pinned against the spline to hold its shape up against the card board template while it dries overnight. As seen in the picture below, the strips were long enough to form the spline completely around the left side of the horizontal tail..........................Tandy
 

Click Here to go to the next page (23)....